We offer two methods of air testing.
Air Pressure Testing
Airtightness is critical to achieve maximum thermal efficiency, unintended leaks can lead to heat loss, energy efficiency and moisture related issues.
- Blower door
- Pulse
For retrofit projects, Air tests should be carried out:
- Pre installation to identify the existing buildings performance and recognise potential issues.
- During Installation to monitor installation quality and identify leaks.
- Post installation to validate the installation and ensure that expected performance is achieved.
Air pressure testing can also be used to:
- Identify leaks. Draughts can often be a problem in existing properties leading to discomfort and higher energy bills. Pressure testing can identify where the problem areas to allow remediation works to be completed.
- To assess background ventilation. Properties with newly installed energy saving measures will become more airtight. Background ventilation tests will need to be performed to assess if an improvement to the ventilation strategy will be required.
Get in touch today to discuss your project requirements
Our Survey & Testing Services

Approved Experts
Our expert team have vast experience in the construction industry
Quality is assured with our approved professionals.
About Us